Tuesday, November 25, 2008

Palomar in Science Fiction - III

Today I bring you the Thanksgiving version of Palomar in Science Fiction. Well, sort of. Have a look at this.



Yes, it is a Bugs Bunny and Marvin the Martian in the cartoon known as Hasty Hare. Just watch it before you read any more. OK?



About 5:40 the cartoon really takes off as far as I am concerned. Bugs drops anchor from the spaceship and all sorts of mayhem ensues.

You wont see the "Palomar" reference until a little later (6:19) as an observatory comes into view. The observatory looks a lot like Mt. Wilson. Wouldn't you agree?

Here's the cartoon version:
And the real thing:

That's much more than a passing resemblance. It looks to me like the artist used Mt. Wilson as the subject for the cartoon.

Finally, here's the observatory with the various astronomical objects that Bugs has managed to drag along.
The Palomar reference (and the admittedly weak Thanksgiving reference, well it is more to do with turkeys) comes at the end when the observatory's director, I. Frisky Frisby, resigns. Notice the stationary:
Yes, it is the Shalomar Observatory. The cartoon was released in 1951 just a few years after the Hale Telescope at Palomar became the world's largest telescope.

As far as I know no employee of the Palomar Observatory has ever resigned to take up turkey farming - yet.

UPDATE: Commenter Anonymous points out that it was actually I. Frisby who signed the letter (I must need to get my glasses checked) and that the astronomer is a caricature of Warner Brothers animator Fritz Freleng.

Judging by the number of comments & emails I have received on this post I would say that I need to have more cartoon astronomy posts in the future.

Saturday, November 22, 2008

200-inch Aluminizing - more photos

Here is a batch of photos from last week's aluminizing of the 200-inch mirror. BIG THANKS to Susan V for capturing these shots while I was away at Corning. She did a super job!

Remember to click on the images for more aluminizing goodness.

The Palomar day crew working under and inside the 200-inch mirror cell prior to the mirror's removal from the telescope.

The 200-inch mirror removed from the telescope, sitting on the aluminizing cart.

That's one dirty mirror.

Tools of the trade for washing telescope mirrors.

Washing the 200-inch mirror.

"You missed a spot."

"Green River" is applied to the surface of the mirror to strip away the thin coating of aluminum. This reveals the mirror's honeycombed backside. Notice that some aluminum still remained on the right side of the disc when this was taken.

The final aluminum is stripped from the mirror.

The mirror is covered overnight to protect the clean surface.

The 17.5-ton bell jar is lifted as the mirror gets a final air cleaning to remove any dust from the surface of the glass.

One of the three glow discharge events prior to aluminizing the mirror.

Two of the 220 coils fire to deposit the thin layer of aluminum to the surface of the mirror.


If you haven't yet, be sure to check the post below for the "official" before and after shots of the mirror.

Friday, November 21, 2008

200-inch Aluminizing - first photos

I have so many photos of the aluminizing I don't know where to start. Here are the dramatic before and after shots of the mirror. As you can see the crew here has done a fantastic job.


Tuesday, November 18, 2008

Aluminizing Update # 7

I haven't had time for updates lately, but this will catch everyone up.

Late Sunday afternoon the new layer of aluminum was deposited on the mirror. Monday morning atmosphere was slowly re-admitted to the tank and the mirror was examined late Monday morning. All looks very good. The mirror is being returned to the telescope as I type this.

Many photos to follow later in the week.

Saturday, November 15, 2008

Aluminizing Update # 6

The crew has finished cleaning the mirror. Just a short while ago they picked up the 17.5-ton top to the bell jar (above) and carefully lowered it around the 200-inch mirror. The mirror is safely inside and the rough pumping has begun.

All of the air must be drawn out in order to put down the new layer of aluminium on the mirror's surface. It typically takes a day or so to achieve the proper vacuum.

Friday, November 14, 2008

Aluminizing Update # 5

Today the mirror was washed and stripped of aluminum. Starting at 7 am PST on Saturday the crew will give the mirror a final alcohol wash and when they are ready they will lift the top to the vacuum chamber over the mirror tomorrow morning and start pumping down to vacuum.

There will be lots of photos to share here on the blog next week of both the aluminizing and of the amazing trip that I have had to the birthplace of the mirror - Corning, NY. Stay tuned.

Thursday, November 13, 2008

Aluminizing Update #4

I am still away and haven 't had any reports come my way, but in the picture below (click to enlarge) you can see the crew giving a final push to put the mirror cart intoplace for washing and stripping the mirror.

Wednesday, November 12, 2008

Aluminizing Update #3

Day 1 finished with the mirror cart being pushed under the telescope. The "knees" were removed and the cart raised to catch the mirror. You can see a really quick movie here. Don't worry, I'll have a much better movie of the activities sometime next week.


The photo shows the mirror as it is now - just lowered from the telescope. That's how it is spending the night. Expect the Palomar Day Crew to push the mirror cart and its precious cargo back to the aluminizing station sometime after 7 am PST on Thursday.

After than the washing and stripping of the old coating will begin.

Aluminizing Update #2

The Cassegrain cage has been removed.

200" Aluminizing Update #1

I am unfortunately travelling today and will have to update the blog from afar. Work on removing the 200-inch mirror is underway. It is a very involved process. First the science instrument is removed from the Cassegrain cage. Then (seemingly) miles of wire and fiber optics must be carefully removed as well. The telescope is fitted with earthquake tie downs, computer racks are removed and then, eventually, the cage is lowered.

At last check of the webcam, the cage is still attached. There is still work to go before they are ready to lower it.
Here's an interesting shot from today's activities. I explained how such images are produced in an earlier post. Two short webcam movies, hosted at HPWREN, of some of this morning's activities are available here and here.

Update: They've opened the dome.

That's something you don't often see in the daytime, but it provides plenty of light & and some much needed warmth for the crew. Don't worry - I expect they will close the dome before the mirror comes out.